Detailed Product Description
The technical performance and parameter of rig accord with the national and industrial standard which are GB 3826.1,GB3826.2,SY5609, main components conform to API Spec Q14F6A7K8A requirements. The rig conforms to 3C standard.
(3) Adopts heavy duty carrier 8×810×812×814×8,which are made by ourselves. Hydraulic assist steering system is adopted, it has good cross country performance.
(4 )CAT diesel engine and Detroit diesel are matched with ALLISON transmission box and TWIN DISC hydraulic transmission box, which can fulfill high effective transmission. Rotary table can adopt electrical drive. Emergency motor power system is optional.
(5) Main brake of main drum can adopt belt or disc brake, auxiliary brake can use air control and water cooling disc brake.
(6) Transmission system of Rotary table can realize Rotary tables forward and reversal rotation, which can satisfy DP screw rotary operation. Anti torque releasing device can ensure the torque is released before the DP distort.
(7) Derrick is hydraulic raising and lowering , front open and double section hydraulic telescoping.
(8) Substructure is double section telescoping or parallelogram structure. The height and floor area can be designed according to users requirements.
(9) Perfect solid control, well control, high pressure manifold system and generator house, air source house, doghouse and mud pump set, which can meet different requirements.
(10) Transmission system of rig, derrick, Drawworks and control system are centralized on the carrier, so the rig can be transported expediently and operated safely.
Model
|
|
ZJ10
|
ZJ15
|
ZJ20
|
ZJ30
|
ZJ40
| |
Carrier driving form
|
|
8×8
|
10×8
|
12×8
|
14×8
|
14×8
14×10
| |
Engine power
|
BHP
|
350
|
475
|
600
|
2×525
|
2×525
| |
Rated hook load
|
kN
|
600
|
800
|
1200
|
1500
|
1800
| |
Max. hook load
|
kN
|
900
|
1100
|
1580
|
1800
|
2250
| |
Max. fastline pull of main drum
|
kN
|
180
|
196
|
210
|
280
|
280
| |
Max. fastline pull of sand drum
|
kN
|
105
|
105
|
105
|
105
|
105
| |
Working height of mast
|
m
|
31.6
|
32
|
35
|
38
|
38
| |
Monkey board(adjusted)
|
m
|
20.6
|
20.6
|
20.6
|
21.7
|
21.7
| |
Substructure
|
Height of substructure
|
m
|
3.4
|
4
|
4.5 or 5
|
6
|
6
|
Substructure area (L×W)
|
m
|
4×6
|
5×7
|
5×7
|
5×7
|
5×7
| |
Traveling system form
|
|
4×3
|
5×4
|
5×4
|
5×4
|
6×5
| |
Normal drilling depth(4 1/2 DP)
|
m
|
1000
|
1500
|
2000
|
3000
|
4000
|
For more information, please contact with freely
Contact: Frank Email: frank@sapwells.net
Website: www.sapwells.net
No comments:
Post a Comment